{"id":24,"date":"2023-11-09T19:18:39","date_gmt":"2023-11-09T19:18:39","guid":{"rendered":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/?p=24"},"modified":"2023-11-09T19:25:03","modified_gmt":"2023-11-09T19:25:03","slug":"curtis-hall-getting-an-overhaul","status":"publish","type":"post","link":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/article\/curtis-hall-getting-an-overhaul\/","title":{"rendered":"Curtis Hall Getting an Overhaul"},"content":{"rendered":"<h1>Curtis Hall Getting an Overhaul<\/h1>\n<p>Beginning Spring \u201924, until Fall of \u201926, Curtis Hall residence hall at Maine Maritime Academy will undergo 4 phases of renovation. The scope of work will include major renovations to the building\u2019s climate control infrastructure, new windows in all dorm rooms, plumbing upgrades including new shower compartments, and a renovation to the main entry lobby, vestibule, and exterior canopy.<\/p>\n<p>This work will greatly improve the residential living experience, and greatly increase safety features in the event of an emergency.<\/p>\n<p>The building will remain operational through all phases of renovation and provide the same number of beds for occupancy.<\/p>\n<p><a href=\"https:\/\/mainemaritime.edu\/student-life\/residential-life\/curtis-hall-renovation\/\">More information about Renovation<\/a><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone noborder size-full wp-image-27\" src=\"\/mariner\/shipmate-november-2023\/wp-content\/uploads\/sites\/44\/2023\/11\/CurtisHall.jpg\" alt=\"Curtis Hall HVAC renovation image\" width=\"915\" height=\"719\" srcset=\"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-content\/uploads\/sites\/44\/2023\/11\/CurtisHall.jpg 915w, https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-content\/uploads\/sites\/44\/2023\/11\/CurtisHall-300x236.jpg 300w, https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-content\/uploads\/sites\/44\/2023\/11\/CurtisHall-768x603.jpg 768w\" sizes=\"(max-width: 915px) 100vw, 915px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Curtis Hall Getting an Overhaul<\/p>\n<p>Beginning Spring \u201924, until Fall of \u201926, Curtis Hall residence hall at Maine Maritime Academy will undergo 4 phases of renovation. The scope of work will include major renovations to the building\u2019s climate control infrastructure, new windows in all dorm rooms, plumbing upgrades including new shower compartments, and a renovation to the main entry lobby, vestibule, and exterior canopy.<\/p>\n<p>This work will greatly improve the residential living experience, and greatly increase safety features in the event of an emergency.<\/p>\n<p>The building will remain operational through all phases of renovation and provide the same number of beds for occupancy.<\/p>\n<p><a href=\"https:\/\/mainemaritime.edu\/student-life\/residential-life\/curtis-hall-renovation\/\">More information about Renovation<\/a><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone noborder size-full wp-image-27\" src=\"\/mariner\/shipmate-november-2023\/wp-content\/uploads\/sites\/44\/2023\/11\/CurtisHall.jpg\" alt=\"Curtis Hall HVAC renovation image\" width=\"915\" height=\"719\" srcset=\"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-content\/uploads\/sites\/44\/2023\/11\/CurtisHall.jpg 915w, https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-content\/uploads\/sites\/44\/2023\/11\/CurtisHall-300x236.jpg 300w, https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-content\/uploads\/sites\/44\/2023\/11\/CurtisHall-768x603.jpg 768w\" sizes=\"(max-width: 915px) 100vw, 915px\" \/><\/p>\n<p><a class=\"more-link\" href=\"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/article\/curtis-hall-getting-an-overhaul\/\">&#8230;Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":29,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"_links":{"self":[{"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/posts\/24"}],"collection":[{"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/comments?post=24"}],"version-history":[{"count":3,"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/posts\/24\/revisions"}],"predecessor-version":[{"id":28,"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/posts\/24\/revisions\/28"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/media\/29"}],"wp:attachment":[{"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/media?parent=24"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/categories?post=24"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mainemaritime.edu\/mariner\/shipmate-november-2023\/wp-json\/wp\/v2\/tags?post=24"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}